Pre-start checks that happen before the work does

WorkSafe is checking residential sites for fall risks until December, and a new residential code of practice starts on 1 April 2027. How to run a pre-start on the phone that gets done before the work starts, and keep the record.

A pre-start check only helps if it happens before the work does. The best place for it is the phone already in the crew's pocket, filled in on site at the start of the day.

Why the pre-start matters this summer

WorkSafe is visiting residential building sites from October to December 2026, with a focus on falls from height. In its 2 October 2026 release, WorkSafe said inspectors want to see that businesses "have identified where workers could fall from height and put effective safety controls in place". It also said those controls apply to short tasks.

The same release puts the cost plainly. Falls from height cause on average 4 deaths, 100 serious injuries and around 1,000 injuries a year, and ladders are involved in about 40% of fall-from-height injuries in construction.

A short check at the start of the day is the moment someone looks at the roof edge, the scaffold and the ladder footing before anyone climbs.

What changes on 1 April 2027

WorkSafe has issued a new approved code of practice, Identifying health and safety roles and responsibilities on a residential construction site. It comes into effect on 1 April 2027, in line with the Health and Safety at Work Amendment Act 2026.

WorkSafe says the code "does not create any new duties" (16 October 2026 release). It explains how existing duties apply when several businesses share a site, and how they consult, cooperate and coordinate.

For a subcontractor on a builder's site, that is a good prompt to be clear about what your crew is responsible for, and to keep a record of what you checked. How the code applies to your work is a question for your health and safety adviser.

Where paper pre-starts go wrong

  • The pad stays in the ute.
  • The form gets filled in at smoko, after the risky work is done.
  • The sheet never reaches the office, so nobody can find it when a client, a builder or an inspector asks.

None of these are about effort. They are about where the form lives and when it gets done.

How it works in Systemise

Crews fill in pre-start, milestone, close-out and inspection forms on the phone, with or without signal. Each submitted form is kept as a PDF.

You can require a form before a day starts, a phase closes or a job completes. Set the pre-start as required before the day starts, and the check comes first rather than whenever someone remembers.

Field teams use the Systemise app on iPhone and Android.

Systemise keeps the record of the check your business sets. It does not decide what your check should contain or whether your controls are adequate. That sits with you and your health and safety adviser.

Writing a pre-start your crew will actually do

  • Keep it to the questions that change what happens today. Ten good questions beat forty.
  • Ask about this site, not sites in general: where could someone fall, what is the ladder standing on, who else is working here today.
  • Make each answer a decision. If a control is missing, the form should say what happens next.
  • Look at the answers after a month and cut the questions nobody answers properly.

See it on one of your own jobs

Want to see a pre-start set up for your crew? Get in touch and we will walk you through it.